Super module installed at first Lianjiang unit

The CA01 'super module' has been installed at unit 1 of the Lianjiang nuclear power plant in China's Guangdong province, the Shanghai Nuclear Engineering Research and Design Institute announced. It is the first of two CAP1000 reactors planned for the first phase of the plant.

Apr 19, 2024 - 12:29
 0  6
Super module installed at first Lianjiang unit
The CA01 'super module' has been installed at unit 1 of the Lianjiang nuclear power plant in China's Guangdong province, the Shanghai Nuclear Engineering Research and Design Institute announced. It is the first of two CAP1000 reactors planned for the first phase of the plant.