Fuel loading completed at Flamanville 3 EPR

The process of loading fuel assemblies into the core of the Flamanville 3 EPR reactor in France has been completed ahead of its start-up. The 1650 MWe (gross) pressurised water reactor is expected to reach 100% output before the end of the year.

May 27, 2024 - 04:52
 0  17
Fuel loading completed at Flamanville 3 EPR
The process of loading fuel assemblies into the core of the Flamanville 3 EPR reactor in France has been completed ahead of its start-up. The 1650 MWe (gross) pressurised water reactor is expected to reach 100% output before the end of the year.